2008 Setup Pictures
Home Up 

   

 

 

Installation started the first weekend of November.  Each phase of the project was completed in small steps to help eliminate the overwhelment of doing the entire project in a single weekend or in a straight shot.   This is a picture of the inside of one of the major components of the system.  The 80 Channel Controller Box.  The box has 5 - 40 Amp Light-O-Rama Controllers in it and is wired to supply up to 200 Amp of power.

 

 

 This is a picture of the 10' Mega Tree that I am building this year.  This is just at the beginning stages of the setup.  A 1 2" pipe was cemented 20" deep into the ground.  The Pipe is a 10' Iron pipe with three guy wires to support the poll.  36 - 100 stands of lights were installed on the tree, making it a total of 3600 lights.  A star was install on the top with 300 lights on it.

 

 

 

 

 

 

 

 

 

 

 

 

 